- Site visit
- View aerial photography
- Look for other impacts to the reach.
- Delineate watershed
- Estimate bankfull width
- Longitudinal profile
- Length: 20-30 times bankfull up and downstream
- Long enough to get past the effects of the road
- Capture riffle/pool sequence detail
- Maximum pool depths
- Capture vertical changes (uniform reaches need fewer measurements)
- Set a benchmark
- Road details (fxing): inlet, outlet, fill height, plunge pool depths, tailwater control.
- Cross-section
- Suitable reference reach
- Start river left, capture through floodplain
- Capture bankfull indicators
- Pebble count
- ~100 particles
- Heel-to-toe (no peeking)
- 10-12 key pieces (not necessarily in the cross-section)