== 7/21 ==
1. Finished the first draft of new ERC20 version of Harmony puzzle dapp: decentralized version, txns happening on client-side without the use of previous central server on Samsung galaxy S20 device with native wallet/keystore integration. https://drive.google.com/file/d/126dPqnGdYzhNrqdK62irAoVQE9kbORPH/view?usp=sharing
cc: @Nick White#8086 :ocean: @Sahil D#5463 @Li | Harmony.one 🎽#7220
This is only the first draft of ERC20 version. Submitting and will be iterating with Samsung for production on Samsung Blockchain Store/Wallet integration.
2. conducted and submitted interview feed on lever for a fullstack engineer position candidate: jenya cc: @Yuriy | Harmony#7679 @Rongjian Lan | Harmony#9543
3. Mainnet explorer HRC20 productionization: Tried to productionize hrc20 update on mainnet, and faced many set up/code incompatibility that blocked the update. Managed to resolve the set up conflicts with ssl/node/vue.js, etc. but at the end, also realized that the current code status of HRC20 branch has functionality issues as well. (error says initializeApp cannot be called twice for Firestore init on backend). So reverted to master branch for explorer mainnet. All wip saved on fe/be repos HRC20 branches. cc: @xiaopeng | Harmony.one#3397 @Haodi#2514 @andrewsong | harmony#7023
4. Studied Terra's Anchor (https://medium.com/terra-money/introducing-anchor-25d782cbb509) defi savings protocol. Updated from @stse#5977 regarding potential integration opportunity, and reviewing the technical work required for integration.
5. KERNEL project (Decentralization solution for AI on blockchain: https://sentinel.substack.com/p/gitcoin-kernel-fellowship-week-1) continues. Week 2 kick off, ready for more well-packed meetings/sessions of learning.
**Challenges**: Due to limited bandwidth/time in a day, some things still slipping through:
1. Java SDK smart contract functionality update work
2. grant program supports
3. less priority logistics stuff
4. time to catch up with other things happening within the team
+ KERNEL, being a global program, meetings and sessions schedule are quite out of norm for PST. In combination with working with Vietnam team/Samsung, late night work being continued.