Skip to content

Instantly share code, notes, and snippets.

@andreacassioli
Last active August 29, 2015 13:57
duality-post-primal-sol
PROBLEM STATUS : PRIMAL_AND_DUAL_FEASIBLE
SOLUTION STATUS : OPTIMAL
OBJECTIVE NAME : obj
PRIMAL OBJECTIVE : 1.09200000e+04
DUAL OBJECTIVE : 1.09200000e+04
CONSTRAINTS
INDEX NAME AT ACTIVITY LOWER LIMIT UPPER LIMIT DUAL LOWER DUAL UPPER
0 grinding UL 2.87999999998441e+02 NONE 2.88000000e+02 -0.00000000000000e+00 -6.24999999997661e+00
1 drilling SB 1.77600000000379e+02 NONE 1.92000000e+02 -0.00000000000000e+00 1.76299093219222e-11
2 manpower UL 3.83999999999842e+02 NONE 3.84000000e+02 -0.00000000000000e+00 -2.37499999999336e+01
VARIABLES
INDEX NAME AT ACTIVITY LOWER LIMIT UPPER LIMIT DUAL LOWER DUAL UPPER
0 x1 SB 1.19999999999665e+01 0.00000000e+00 NONE -1.22142547778192e-10 -0.00000000000000e+00
1 x2 SB 7.19999999992199e+00 0.00000000e+00 NONE -1.53700139339745e-10 -0.00000000000000e+00
2 x3 LL 7.88886826796173e-11 0.00000000e+00 NONE -1.24999999999441e+02 -0.00000000000000e+00
3 x4 LL 3.23546896699585e-12 0.00000000e+00 NONE -2.31249999999831e+02 -0.00000000000000e+00
4 x5 LL 1.36145745561894e-11 0.00000000e+00 NONE -3.68749999999485e+02 -0.00000000000000e+00
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment