This plan is to perform the site migration from Photohop's current environment on Linode to the one on Engine Yard.
- Lower TTL for domain (Photohop)
- Put up maintentance page for existing site (Photohop)
- Take fresh database dump from live site (Photohop)
- Load DB dump into Engine Yard (EY)