Skip to content

Instantly share code, notes, and snippets.

@ruthgrace
Created July 27, 2019 05:43
Show Gist options
  • Save ruthgrace/ad82e9612431deb787d3ce2898c1de60 to your computer and use it in GitHub Desktop.
Save ruthgrace/ad82e9612431deb787d3ce2898c1de60 to your computer and use it in GitHub Desktop.
Dev Phase
* Circuitry grossly working
* Mechanical parts designed at a high level
Prototype Validation Phase
* Validate that product can be built in final form factor
Engineering Validation Test
* Electrical validation
* Mechanical reliability testing
* Start necessary certifications
Design Verification Test
* Solve issues that decrease yields
Production Validation Test
* Ramp up production
* Engineering is required to solve production issues, such as parts being out of spec
Early Field Failure Analysis
* Analyze and fix failures seen in product by initial customers
Sustaining Phase
* Maintain production through parts' end of life
* Analyze and solve systematic customer issues that come up, such as an increase in returns
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment