Skip to content

Instantly share code, notes, and snippets.

@semanticdata
Last active May 3, 2024 17:18
Show Gist options
  • Save semanticdata/a2052f31ac55306c5859777baf2d8e4a to your computer and use it in GitHub Desktop.
Save semanticdata/a2052f31ac55306c5859777baf2d8e4a to your computer and use it in GitHub Desktop.
{
"meta": {
"theme": "rickosborne"
},
"basics": {
"name": "Miguel Pimentel",
"label": "Asst. Contract Administrator",
"image": "https://raw.githubusercontent.com/semanticdata/semanticdata.github.io/master/static/img/avatar.webp",
"email": "mglpmntl@gmail.com",
"phone": "(952) 855-3270",
"url": "https://miguelpimentel.do/",
"summary": "Asst. Contract Administrator with more than 8 years experience in a wide range of infrastructure projects. Proficient in managing underground utilities and earthwork projects. Additionally, I have experience in rehabilitating and reconstructing public facilities.",
"location": {
"city": "Bloomington",
"countryCode": "US",
"region": "MN"
},
"profiles": [
{
"network": "LinkedIn",
"url": "https://www.linkedin.com/in/miguelpimentel29"
}
]
},
"work": [
{
"name": "Metropolitan Council",
"position": "Asst. Contract Administrator",
"url": "https://metrocouncil.org/",
"startDate": "2020-06",
"summary": "Administer construction contracts ensuring that budget, quality, and schedule goals are achieved…",
"highlights": [
"Coordinate contract reviews and proposed changes, ensuring adherence to project schedules and costs.",
"Oversee projects through installation, construction, and commissioning phases, ensuring compliance with contract specifications.",
"Identify potential impacts on project timelines or expenses and implement measures to mitigate risks.",
"Manage contract processes, including proposals, evaluations, preparation, and negotiations.",
"Monitor procurement, construction, and facility service contracts, managing budgets and recommending revisions as needed.",
"Coordinate with regulatory agencies, governmental units, and other stakeholders.",
"Participate in contract negotiations, evaluate proposals, and ensure consulting engineers' compliance.",
"Assist in-house design preparation, create procurement process documents, and handle change order estimates and negotiations."
]
},
{
"name": "City of Bloomington",
"position": "Engineering Technician",
"url": "https://www.bloomingtonmn.gov/",
"startDate": "2018-09",
"endDate": "2020-06",
"summary": "Provide manual and technical field and office work in infrastructure design and inspection, traffic and transportation, water resources, property services, data management and GIS under supervision. Work includes a variety of tasks including drafting plans, cost estimates, surveying, inspection, and data management.",
"highlights": [
"Inspected, managed, and coordinated public infrastructure projects.",
"Prepared and produced daily reports and summaries of work performed.",
"Designed and drafted plans for residential roads and bike trails.",
"Performed quantity tracking and analysis for construction activities."
]
},
{
"name": "City of Minneapolis",
"position": "Engineering Technician III - Chief Field Inspector",
"url": "https://www.minneapolismn.gov/",
"startDate": "2016-08",
"endDate": "2018-09",
"summary": "Perform specialized high level technical support and design work, act a liaison with other parties for the Professional Engineer in the field, and act as lead worker on a field crew performing construction inspection.",
"highlights": [
"Acted as liaison between other city departments, residents, and contractors.",
"Kept a record of daily activities and work performed.",
"Prepared and hosted weekly progress report meetings.",
"Kept a record of daily activities and work performed.",
"SSampled and tested construction materials, incl. Asphalt, Concrete, and Soils."
]
},
{
"name": "Ingenieros Asociados-Construcciones",
"position": "Civil Engineering Technician",
"url": "https://iacocyc.com/",
"startDate": "2010-02",
"endDate": "2014-03",
"highlights": [
"Regularly conducted site visits to verify compliance with construction plans.",
"Assisted with survey, design, planning, and construction of water and sewage systems."
]
}
],
"education": [
{
"institution": "Instituto Tecnológico de Santo Domingo",
"url": "https://www.intec.edu.do/",
"area": "Civil Engineering",
"studyType": "183/275 semester credits towards Bachelor's Degree (incomplete)",
"startDate": "2009-08",
"endDate": "2014-07"
}
],
"certificates": [
{
"name": "Construction Site Management",
"issuer": "University of Minnesota",
"url": "https://erosion.umn.edu/courses-registration"
},
{
"name": "Bituminous Street Inspector (BSIC)",
"issuer": "MnDOT",
"url": "https://www.dot.state.mn.us/technical-certification/courses/bsic.html"
},
{
"name": "Bituminous Mix Designer (BMDC)",
"issuer": "MnDOT",
"url": "https://www.dot.state.mn.us/technical-certification/courses/bmdc.html"
},
{
"name": "Concrete Field Inspector (CFIC)",
"issuer": "MnDOT",
"url": "https://www.dot.state.mn.us/technical-certification/courses/cfic.html"
},
{
"name": "Concrete Plant Tester (CPTC)",
"issuer": "MnDOT",
"url": "https://www.dot.state.mn.us/technical-certification/courses/cptc.html"
},
{
"name": "Grading and Base Inspector (GBIC)",
"issuer": "MnDOT",
"url": "https://www.dot.state.mn.us/technical-certification/courses/gbic.html"
}
],
"skills": [
{
"name": "Contract Administration",
"keywords": [
"Requisitions",
"Plan Review",
"Change Orders",
"Procurement"
]
},
{
"name": "Project Management",
"keywords": ["Budgeting", "Cost Control", "Conflict Resolution"]
}
],
"languages": [
{
"language": "English",
"fluency": "EF SET 97/100"
},
{
"language": "Spanish",
"fluency": "Native Speaker"
}
],
"interests": [
{
"name": "Public Infrastructure"
},
{
"name": "Web Development"
}
],
"references": [
{
"name": "Jereld Hanson",
"reference": "(651) 308-7069"
},
{
"name": "Elias Castillo",
"reference": "(612) 402-6401"
},
{
"name": "Richard Stevens",
"reference": "(612) 868-0010"
}
],
"projects": [
{
"name": "City of Bloomington Pavement Management Program",
"startDate": "2019-03",
"summary": "Design and inspection of resurfacing of residential roads and new bike trails.",
"highlights": ["Approx. cost: US$785,000"]
},
{
"name": "Blue Line Intrusion Detection System Upgrade",
"startDate": "2021-03",
"summary": "New installation and demolition of the intrusion detection system, strobes, twc loops, wall mounted cabinets, electrical/communication conduits, junction boxes, and wiring.",
"highlights": ["Approx. cost: US$440,000"]
},
{
"name": "Northtown Transit Center Reconstruction",
"startDate": "2021-09",
"summary": "Demolition and reconstruction of existing facility and surrounding parking lots. Installation of prefabricated bathroom, CCTV survaillance system, new street lighting.",
"highlights": ["Approx. cost: US$1,070,000"]
},
{
"name": "Metro Transit Police Department Substation Rehab",
"startDate": "2021-12",
"summary": "Rehabilitation of previously public space into Metro Transit Police Department's newest substation in downtown Saint Paul.",
"highlights": ["Approx. cost: US$880,000"]
}
]
}
@thomasdavis
Copy link

@semanticdata seeing some registry errors. thought i'd help out. you can't have comments in json, so i would try uncomment or remove the theme line.

@thomasdavis
Copy link

@semanticdata Your dates do have to be "2021-11-07" style, I can see the validation log suggesting otherwise though. If I can't remember the exact day I just put 01 e.g. 2021-11-01

@semanticdata
Copy link
Author

@thomasdavis Thank you for the help. I'm slowly adding my info and I keep breaking it on accident.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment